
Spencer®VacuumCleaning SystemsHandling, Installing andOperating InstructionsImportantDo not operate machine in unstable, low-flow range (surge).Read a
VI. Four-BearingOverhung MachineInstructions for Disassembly and Reassembly Warning: Be sure all electrical power is disconnected priorto performing B
Notes:1. Although three impellers and two deflectors are shown in thistypical drawing, the number in each machine will vary depen-dent on the specific
12VII. Four-BearingOutboard MachineInstructions for Disassembly and ReassemblyWarning: Be sure all electrical power is disconnected priorto performing
DischargeIntakeNotes:1. Although eight impellers and seven deflectors are shown inthis typical drawing, the number in each machine will varydependent
14VIII. CentrifugalSeparatorTo assure efficient operation the separator must be sealedproperly to prevent leakage. The access doors, dirt can, dis-cha
15X. Filter BagInformationChanging Filter BagsKeep a set of spare filter bags in reserve at all times. Examinethe bags in service periodically and rep
16XI. Wet SeparatorThe Wet Separator will be supplied for wet material pickup andwater flushing. This separator will have a ball float shutoff, afloat
17XIII. Trouble Shooting Guide -SeparatorsTrouble Probable Cause Corrective ActionCentrifugal SeparatorsVacuum Producer Motor – Leaks. Check access do
18Trouble Probable Cause Corrective ActionInsufficient air Low vacuum as determined by measurement with a manometer or vacuum gauge:through system– I
19Trouble Probable Cause Corrective ActionMotor malfunctions:– Electric hum or whine – some usually normal. Check motor manufacturer’s instructions. C
Contents PageI General Instructions ... 2II Coupling Alignment ...
Form EE9.1, Copyright 2006 The Spencer Turbine Company 1206KBA1.5Products & ServicesIndustrially rated products offering effective solutionsfor ai
All tubing should be of ample size to minimize frictional loss. Itis absolutely essential that all joints be airtight and that there beno leaks in the
4II. Coupling AlignmentFor Power Mizer®Cast Centrifugal Vacuum Producers refer toForm WW.Caution: The coupling on this machine was carefullyaligned at
5III. Replacement PartsHow to order replacement partsWhen ordering replacement parts, it is important that the infor-mation you furnish to Spencer is
6IV. LubricationInstructionsFor Power Mizer®Cast Centrifugal Vacuum Producers refer toForm WW.Caution: Recommended bearing grease is Chevron SRI,Numbe
7Lubrication of Replacement Bearings (Four bearing designsonly) When installing new bearings, it is necessary to repackbearings with grease. Do this b
8V. Standard OverhungMachineInstructions for Disassembly and Reassembly (Multi-Stage)Warning: Be sure all electrical power is disconnected priorto per
9Notes:1. Although three impellers and two deflectors are shown in thistypical drawing, the number, in each machine, will vary depen-dent on the speci
Comments to this Manuals